Who should pay for the study? Elia Support July 02, 2021 08:13 Must always be the grid user with the connection contract. Therefore the study cannot be paid for by a third party. Related articles What should I do after the detailed study has been submitted? When & How can I renew my Annex 2? (as a Grid User) How do I use docusign? How can I pay this invoice? How to navigate through EPIC