epic team
- Total activity 192
- Last activity
- Member since
- Following 0 users
- Followed by 0 users
- Votes 0
- Subscriptions 96
Activity overview
Latest activity by epic team-
epic team created an article,
How can I request additional authorizations for my user account in EPIC ?
The EPIC portal is built so that the clients can manage the authorizations of their users (colleagues) by themselves, without any intervention from Elia or 50Hertz. If you wish to obtain author...
-
epic team created an article,
How can I view the authorizations of my user account in EPIC ?
In order to view the authorizations of your user account in EPIC, you need to open your profile page: Login to EPIC, Go to your profile (top right) Look at your access and permissions, you shoul...
-
epic team created an article,
How can I view my Financial Guarantee / Collateral / Bank Guarantee information
If you have an Access Contract or BRP Contract with Elia, you can find information related to your financial guarantee / collateral in the EPIC portal. REMARK: in order to be able to access thi...
-
epic team created an article,
What is the difference between ‘reserved’ and ‘allocated’ capacity and how were these taken into account?
Capacity is reserved during the study process, in accordance with applicable legislation. Capacity is only allocated when the connection contract or its annex 8 is signed. Both reservations and all...
-
epic team created an article,
Which criteria have been used to calculate the remaining available hosting capacity?
The remaining available hosting capacity is computed to in order to respect the loading capabilities of the grid infrastructure in situation without outage of a grid element (e.g. line, cable, tran...
-
epic team created an article,
Is it possible to identify the impact of a specific Elia infrastructure project?
It is important to note that the resulting hosting capacities are based on the portfolio of planned grid infrastructure projects, as published through Elia’s Federal Development Plan and Regional I...
-
epic team created an article,
How to interpret the flexibility level?
This refers to the percentage of expected yearly energy curtailment, relative to the yearly total generated or consumed energy. E.g. a “5% flexibility level” photovoltaic generation unit that could...
-
epic team created an article,
How to interpret the profile types?
Based on the user selection “Profile”, the hosting capacity for one of the following grid user types will be shown: “Load” for which a flat all year-round consumption/offtake profile is considered...
-
epic team created an article,
Is there still a need for an orientation study in case the map shows sufficient hosting capacity?
Yes, the map is only intended to pre-inform grid users on a first, high-level view on grid hosting capacities on top of already reserved/allocated capacities and a margin for low voltage connected ...
-
epic team created an article,
What to do in case of insufficient hosting capacity?
This does not necessarily mean that a new connection or connection evolution is not possible. The resulting available hosting capacity after execution of an orientation/detailed connection study co...