Who can apply for the study? epic team July 02, 2021 08:10 May be an external party, but must always be in the name of the grid user with the connection contract. Related articles Which study should I apply for? How much does such a study cost? What should I do after the detailed study has been submitted? Who should pay for the study? I want to increase/decrease my purchase or I want to install a production unit, what should I do?