Capacity is reserved during the study process, in accordance with applicable legislation. Capacity is only allocated when the connection contract or its annex 8 is signed. Both reservations and allocations are treated identically for the purpose of this publication. They are included in the reference operating state of the grid and will therefore not be shown as "remaining available hosting capacity".